HomeNewsPhotos

Photos

No Heat No Cool Team Andrews
The 316th Civil Engineer Squadron will initiate an installation-wide "No Heat/No Cool" period from Oct. 15 - Nov. 30, 2020, weather permitting, to assist in switching heating, ventilation and air conditioning units from cooling to heating modes.

Download Image: Full Size (0.07 MB)
Tags:
Photo by: 316th Wing Public Affairs |  VIRIN: 201002-F-TR430-0001.JPG