JOINT BASE ANDREWS, Md. -- The 11th Civil Engineer Squadron will initiate an installation-wide "No Heat/No Cool" period to assist them in switching heating, ventilation and air conditioning units from cooling to heating modes.

The start date for this period will be Oct. 15, 2019 with an anticipated completion date of Nov. 30, 2019 or later weather permitting.